Blog

Method Statement for Crosshole Sonic Logging for Bored Piles

What is Crosshole Sonic Logging? Crosshole Sonic Logging (CSL) is carried out on drilled shafts/bored piles to inspect the structural integrity, and extent and location of defects, if any, by sending ultrasonic pulses through the concrete from one probe to another (probes located in parallel tubes). The CSL is carried out as per ASTM 6760. Both... Continue Reading →

Advertisements

Method Statement for the Repair of Concrete

What is Method Statement for the Repair of Concrete?This method statement for the repair of concrete describes the details of rectification for most common construction defects of concrete structures right after the casting activity and formworks deshuttering such as concrete cracking (non-structural and structural cracks), honeycombs or spalling, pinholes and blowholes, form tie rod/ bolt... Continue Reading →

How to Review a Certified Mill Test Report

What is a Certified Mill Test Report? The Certified Mill Test Report is a tool used to ensure that received raw material matches the engineering and purchase order requirements. It is a quality assurance document generated by the raw material manufacturer and provided with the material to intermediate suppliers and ultimately to a finished goods manufacturer.... Continue Reading →

Internal Audit in Construction Company

What is an audit? According to ISO 9000:2005, the Fundamentals and Vocabulary standard, an audit is: “A systematic, independent, and documented process, for obtaining audit evidence and evaluating it objectively to determine the extent to which audit criteria are fulfilled.” In other words, making sure that what is going on in practice is in line... Continue Reading →

Method Statement for Anti-termite

The method statement for anti-termite defines the procedure for the sequence of works for surface treatments and termite control after leveling/compaction of the filled soil and before polythene/damp proof membrane is laid, considering all the necessary safety and quality aspects of the work activities. What is the anti-termite treatment? Anti-termite treatment is a process in... Continue Reading →

Project Quality Plan [Template]

The Project Quality Plan (PQP) is a written plan which serves as the basis for the overall Project Quality Assurance System and identifies the Quality requirements, methods to achieve Project Quality objectives & continual improvements during the execution of a specific construction project. This is different from a Company Quality Manual, which explains the quality policies… Continue Reading →

Method Statement for False Ceiling Works

This method statement for false ceiling describes the details of the installation of suspended gypsum board and tile ceiling with the use of metal framings in the project. This also outlines the health and safety hazards involved and include the guide on how to do the process safely. What is a false ceiling? A false ceiling or... Continue Reading →

Create a website or blog at WordPress.com

Up ↑