How to Review a Certified Mill Test Report

What is a Certified Mill Test Report? The Certified Mill Test Report is a tool used to ensure that received raw material matches the engineering and purchase order requirements. It is a quality assurance document generated by the raw material manufacturer and provided with the material to intermediate suppliers and ultimately to a finished goods manufacturer.... Continue Reading →

Advertisements

Internal Audit in Construction Company

What is an audit? According to ISO 9000:2005, the Fundamentals and Vocabulary standard, an audit is: “A systematic, independent, and documented process, for obtaining audit evidence and evaluating it objectively to determine the extent to which audit criteria are fulfilled.” In other words, making sure that what is going on in practice is in line... Continue Reading →

Project Quality Plan [Template]

The Project Quality Plan (PQP) is a written plan which serves as the basis for the overall Project Quality Assurance System and identifies the Quality requirements, methods to achieve Project Quality objectives & continual improvements during the execution of a specific construction project. This is different from a Company Quality Manual, which explains the quality policies… Continue Reading →

Flowchart for Document Controls in Construction Project

Infographic presentation of the flowchart of document controls in construction project This simple presentation thru infographic of how the document control is being implemented in the Construction project. This procedure is part of QA documentation in fulfilling the project requirements. Distribution and document control procedure in the construction project Any report, record, drawing, design calculation, mom,... Continue Reading →

Flowchart of Redline Markup and As Built Drawings Sample Being Implemented In The Construction Projects

Legend: IFC - Issued For Construction The flowchart shows how the redlines shall be prepared following the approval and implementation of each construction activity. This describes the process, roles and responsibility, requirements, records to be maintained and approval of redline drawings. The “Redline Markup” is being kept and updated by the  Construction Team and the  “As Built” submission... Continue Reading →