method-statement-for-laying-kerbs

References Project Specifications (Vehicle Crash Barriers)Project Specifications (Kerbs, Footways, and Paved Areas)Health, Safety, and Environment (HSE) PlanConstruction Environmental Management (CEMP) PlanConcrete SpecificationsMethod Statement for Concrete WorksBarriers and Kerbs Setting Out Responsibilities Project Manager Responsible for accomplishing the stated project objectives which include creating clear and attainable project objectives, building theContinue Reading

method-statement-for-blindings

The Method Statement for Blinding defines the rules to be applied during all the blinding concrete (or lean concrete) activities to ensure that all the works are properly executed in accordance with project specification, applicable standards, and health, safety & environment requirements. Methodology A. Pre-pour Concrete Works: Prior to commencingContinue Reading

method-statement post-tensioning of slab

What is the method statement for post tensioning of concrete slab? The method statement for post-tensioning of the slab is the systematic procedure of safely performing the work from strands installation, final stressing, grouting operation, and de-shuttering by ensuring that quality control objectives are implemented. Post-tensioning of concrete slab methodologyContinue Reading

method statement for construction of manhole

What is the Method Statement for Construction of Manhole? This Method Statement for Construction of Manhole Chambers, Bases and Appurtenances is the systematic procedure in safely performing the detailed installation of precast manholes and appurtenances ensuring that quality control objectives are maintained. This method statement also covers, in brief, theContinue Reading

method statement for precast

Purpose of Method Statement for Precast Concrete Fabrication and Installation The purpose of this method statement for precast concrete fabrication and installation is to establish systematic procedures in performing safely the detailed precast methodology and ensuring that quality control objectives are maintained with accurate established records for all construction activitiesContinue Reading

method-statement-repair-of-concrete

What is Method Statement for the Repair of Concrete? This method statement for the repair of concrete describes the details of rectification for most common construction defects of concrete structures right after the casting activity and formworks deshuttering such as concrete cracking (non-structural and structural cracks), honeycombs or spalling, pinholesContinue Reading

Method Statement for In-situ Concrete & General Concrete Work

This method statement for in-situ concrete & general concrete work describes the process to be implemented during the entire activity for such as in-situ concrete, concrete foundations, slab on grade, blindings,  columns, beams, retaining walls, slabs, raft concrete, precast concrete, self-consolidating concrete, mass concrete and any structural concrete works. TheContinue Reading

What is Self Consolidating Concrete? Self Consolidating Concrete (SCC) is an innovative concrete that does not require vibration for placing and compaction. It is able to flow under its own weight, completely filling formwork and achieving full compaction, even in the presence of congested reinforcement. The hardened concrete is dense,Continue Reading