Method-Statement-Construction-Bored-Piles

Method statement of bored piles comprises of hole boring into the ground, installing steel reinforcement and casting with concrete to form a pile. Bored piles are constructed in the ground by boring in the circular shape of designed diameters to transfer load from the superstructure into the ground through friction and end bearing.Continue Reading