method statement rebar works

This method statement covers the activities involved in the fabrication, installation of the rebar in the project considering the quality and safety requirements. This method statement defines the activities of the rebar shop drawings and on-site activities and do not cover the rebar cut and bent fabrication works if any inContinue Reading

method statement ceramic floor tiles

The method statement for ceramic floor tiles encompasses the preparation of the surfaces, mixing and applying the adhesive or mortar materials, laying and grouting of tiles, and cleaning/protection of the finished work. Floor tiles are typically manufactured materials such as ceramic, stone, vinyl, etc. which are laid upon an existingContinue Reading

Method-Statement-Construction-Bored-Piles

Method statement of bored piles comprises of hole boring into the ground, installing steel reinforcement and casting with concrete to form a pile. Bored piles are constructed in the ground by boring in the circular shape of designed diameters to transfer load from the superstructure into the ground through friction and end bearing.Continue Reading

method-statement-for-plastering

This method statement for cement plastering work describes the process to be implemented during the entire plastering activity for a safe and quality manner. This also outlines and describes the procedure such as plaster preparations of the surfaces, mixing of cement plaster or mortar, rendering coat of wall, inspection of the plasterwork and all other related activity. This activity should be performed with strict compliance and implementation of safety requirements and project specifications to complete the plastering work both for concrete and blockworks.Continue Reading

Method Statement for In-situ Concrete & General Concrete Work

This method statement for in-situ concrete & general concrete work describes the process to be implemented during the entire activity for such as in-situ concrete, concrete foundations, slab on grade, blindings,  columns, beams, retaining walls, slabs, raft concrete, precast concrete, self-consolidating concrete, mass concrete and any structural concrete works. TheContinue Reading

This method statement for blockworks / masonry describes the process to be implemented during the entire activity. This activity uses materials such as concrete masonry units, hollow blocks, solid blocks, insulated blocks, lightweight blocks, glass units, etc. Since every project has its own specifications, thus it is imperative to baseContinue Reading