method statement for excavation

What is the method statement for excavation (Open-cut excavation up to formation level)? This method statement for excavation defines the sequence and control procedures to be followed for excavation works (Open-cut excavation up to formation level) in the construction projects. This process also provides practical guidance to manage health andContinue Reading

method statement for installation of cable trays,ladders and trunking system

Table of Contents 1. Purpose 2. Scope 3. System Description4. Definitions 5. References 6. Abbreviations 7. Responsibilities 8. Resources 9. Procedure 10. Health Safety and Environment11. Quality Assurance and Quality Control 12. Attachments1. PURPOSE This Method Statement formalizes the requirements for the Installation of Cable Trays, Ladders, and Trunking System.Continue Reading

method-statement-repair-of-concrete

What is Method Statement for the Repair of Concrete? This method statement for the repair of concrete describes the details of rectification for most common construction defects of concrete structures right after the casting activity and formworks deshuttering such as concrete cracking (non-structural and structural cracks), honeycombs or spalling, pinholesContinue Reading

method-statement-anti-termite

The method statement for anti-termite defines the procedure for the sequence of works for surface treatments and termite control after leveling/compaction of the filled soil and before polythene/damp proof membrane is laid, considering all the necessary safety and quality aspects of the work activities. What is the anti-termite treatment? Anti-termiteContinue Reading