Method Statement For Anti-carbonation Coating
The method statement for anti-carbonation coating defines the control procedures, technical details covering surface preparation, pre-application, during application and completion of application method, to achieve the optimum performance for the specified anti-carbonation treatment used in concrete substrates. What is anti-carbonation coating?Anti-carbonation coating is surface treatment primarily used to protect theContinue Reading
Method Statement For Sheet Piling
What is method statement for sheet piling? The method statement for sheet piling describes the procedures and methodology for the installation of sheet piles which serve as excavation support and earth retention during the project construction stage. What is the difference between the bored piling and sheet piling?Bored piling isContinue Reading
Civil Engineering Board Exam Problems for May 2018
How do the Civil Engineering Board Exam Problems are structured? The Civil Engineering Board Exam Problems and their implementation are presented here. Ever since the promulgation of the Resolution No. 02 Series of 1995 by the Philippine Board of Civil Engineering as provided by the Civil Engineering Law in theContinue Reading
All About The 2020 Civil Engineering Board Exam-Philippines (Updates-2021)
What is the 2020 Civil Engineering Board Exam in the Philippines? The 2020 Civil Engineering Board Exam-Philippines, also called Philippine Civil Engineering Licensure Examination, is the professional licensure examination for incoming civil engineers in the Philippines.The Professional Regulation Commission (PRC) through the Republic Act No. 544 (As Amended by R.A.Continue Reading
Method Statement for Dewatering System
Method Statement for Dewatering System [Template] 1. IntroductionThis Method Statement for Dewatering System defines the sequence and the control procedures to be followed for the dewatering of xxxxx project. What is dewatering? Dewatering is described as the control of surface and subsurface hydrologic environments so as to permit the constructionContinue Reading
Method Statement for Backfilling and Compaction Procedure-Earthwork
This method statement defines the methodology for execution of backfilling and compaction procedure related to earthwork & to describe the sequence of activities, utilization of resources, documents & drawings involved, maintaining & recording documents & data to meet project specific & contractual obligations and risk assessment for the activities involved.Continue Reading
Pile Head Trimming / Cut Off Method Statement [Template]
What is the pile head trimming /cut off method statement? Pile head trimming or cut-off method statement is the documentation requirement related to piling works methodology submitted to the project consultant for approval prior to proceeding with its implementation. Failure to secure this approved document is one of the reasonsContinue Reading
Method Statement For Excavation (Open-cut Excavation up to Formation Level) [Template]
What is the method statement for excavation (Open-cut excavation up to formation level)? This method statement for excavation defines the sequence and control procedures to be followed for excavation works (Open-cut excavation up to formation level) in the construction projects. This process also provides practical guidance to manage health andContinue Reading
Method Statement for Tower Crane Installation
This Method Statement for Tower Crane Installation can be converted into template which can be use as part of the submission for QA documentation particularly of tower crane utilization in construction project. This Method Statement for Tower Crane Installation defines the sequence and describes the control procedures to be followedContinue Reading
Method Statement for Installation of Cable Trays, Ladders, and Trunking System
Table of Contents 1. Purpose 2. Scope 3. System Description4. Definitions 5. References 6. Abbreviations 7. Responsibilities 8. Resources 9. Procedure 10. Health Safety and Environment11. Quality Assurance and Quality Control 12. Attachments1. PURPOSE This Method Statement formalizes the requirements for the Installation of Cable Trays, Ladders, and Trunking System.Continue Reading