power cable laying

Naturally, power cables are intended to be installed or buried underground. The quality of cable joints, branch connections, and good cable laying are all important factors that affect how reliable an underground cable network is. Underground power cable laying can be done using one of three major techniques: direct laying,Continue Reading

Testing and Commissioning of Swimming Pools

Introduction-Testing and Commissioning of Swimming Pools The Testing and Commissioning of Swimming Pools (T & C) describes quality control activities related to testing and commissioning requirements in conformance with specifications, local and international regulations. 1.1 References International Standard BS 7671 – IEE Wiring Regulations 17th Edition, Requirements for Electrical InstallationContinue Reading

document-control-procedure

The document control procedure is the control of content, naming convention, numbering sequences, change control, authorization, distribution, access, archiving, securing, and withdrawal or disposal of documents in the Construction ProjectThis is a procedure that has been developed to ensure that project staffs, collaborators, and contractors have consistent, complete, and correctContinue Reading

flowchart-document-control-management-system_

Infographic presentation of the flowchart of document controls in construction project This simple presentation thru infographic of how the document control is being implemented in the Construction project. This procedure is part of QA documentation in fulfilling the project requirements. Distribution and document control procedure in the construction project Any report,Continue Reading