method statement for split AC

This method statement of split AC units installation ensures that specified materials are installed and agreed procedures are implemented during the execution of work. This MST defines the documentation and responsibilities for controlling the project quality and HSE requirements. Scope This method statement is intended to outline the activities andContinue Reading

method statement for painting works

This Method Statement for Painting Works establishes the systematic procedures to safely perform the detailed methodology for painting works of internal walls, ceiling, and external walls. This ensures that the quality control objectives are maintained and accurate records are established of all activities in different stages associated with the project.Continue Reading

method-statement-for-cctv

The Method Statement for CCTV (Closed Circuit Television System) defines the documentation and responsibilities for controlling the installation of CCTV systems for the project as specified in project specifications and instructions. The method statement ensures that the specified material is installed and agreed procedures are implemented during the execution ofContinue Reading

method-statement-sump-pump

The Method Statement for Sump Pump defines the specified materials are installed and the agreed procedure is implemented as per quality, project specifications, and health, safety & environment requirements. Scope This method statement covers the installation procedures for the following type of GRUNDFOS Storm Water Submersible Pumps: SLV Model HereContinue Reading

method-statement-for-laying-kerbs

This Method Statement for Laying Kerbs, Precast Concrete Barriers, & Paver Interlock Blocks Installation defines the sequence, quality procedures, and health, safety & environment (HSE) requirements to be followed for the implementation of the activity. References Project Specifications (Vehicle Crash Barriers)Project Specifications (Kerbs, Footways, and Paved Areas)Health, Safety, and EnvironmentContinue Reading

method-statement-transformer

The method statement for transformer defines the installation of oil-type transformers as per quality procedure, project specifications, and health, safety & environmental requirements. Scope of Work The scope of this document includes, but not limited to the following:a) Methodology for installation of transformersb) Equipment usedc) Inspection and Test Plansd) HSEContinue Reading

method statement fire protection equipment

Scope of Work This Method Statement for Fire Protection Equipment defines the execution for the installations in accordance with the relevant reference standards, project specifications, approved shop drawings, and health, safety & environment (HSE) requirements.The installation contractors are required to follow this method statement at all times during the wholeContinue Reading