Method Statement for Ceramic Floor Tiles
The method statement for ceramic floor tiles encompasses the preparation of the surfaces, mixing and applying the adhesive or mortar materials, laying and grouting of tiles, and cleaning/protection of the finished work. Floor tiles are typically manufactured materials such as ceramic, stone, vinyl, etc. which are laid upon an existingContinue Reading
Method Statement of Bored Piles
Method statement of bored piles comprises of hole boring into the ground, installing steel reinforcement and casting with concrete to form a pile. Bored piles are constructed in the ground by boring in the circular shape of designed diameters to transfer load from the superstructure into the ground through friction and end bearing.Continue Reading
Flowchart for Document Controls in Construction Project
Infographic presentation of the flowchart of document controls in construction project This simple presentation thru infographic of how the document control is being implemented in the Construction project. This procedure is part of QA documentation in fulfilling the project requirements. Distribution and document control procedure in the construction project Any report,Continue Reading
Method Statement for Cement Plastering – Architectural Finishings Concrete Work
This method statement for cement plastering work describes the process to be implemented during the entire plastering activity for a safe and quality manner. This also outlines and describes the procedure such as plaster preparations of the surfaces, mixing of cement plaster or mortar, rendering coat of wall, inspection of the plasterwork and all other related activity. This activity should be performed with strict compliance and implementation of safety requirements and project specifications to complete the plastering work both for concrete and blockworks.Continue Reading
Method Statement for Construction Industry
What is Method Statement? A method statement is a written document on how a particular activity or process will be undertaken detailing the step-by-step procedures and safety system of work. Risk and necessary remedial measures to be carried out should be elaborated to protect the site workforce and members ofContinue Reading
Method Statement for In-situ Concrete & General Concrete Work
This method statement for in-situ concrete & general concrete work describes the process to be implemented during the entire activity for such as in-situ concrete, concrete foundations, slab on grade, blindings, columns, beams, retaining walls, slabs, raft concrete, precast concrete, self-consolidating concrete, mass concrete and any structural concrete works. TheContinue Reading
Self Consolidating Concrete
What is Self Consolidating Concrete? Self Consolidating Concrete (SCC) is an innovative concrete that does not require vibration for placing and compaction. It is able to flow under its own weight, completely filling formwork and achieving full compaction, even in the presence of congested reinforcement. The hardened concrete is dense,Continue Reading
Concrete Sampling of Freshly Mixed Concrete at the Field (BS EN 12350-1:2009)
This British Standard specifies two procedures for concrete sampling which are implemented by composite sampling and by spot sampling. Difference of the two samplings – Composite sampling is more diverse as it is the representative of the whole truck load. Scoopfuls are taken from four different parts of the loadContinue Reading
Method Statement for Blockworks / Masonry
This method statement for blockworks / masonry describes the process to be implemented during the entire activity. This activity uses materials such as concrete masonry units, hollow blocks, solid blocks, insulated blocks, lightweight blocks, glass units, etc. Since every project has its own specifications, thus it is imperative to baseContinue Reading
Flowchart of Redline Markup and As Built Drawings Sample Being Implemented In The Construction Projects
Legend: IFC – Issued For Construction The flowchart of Redline Markup and As Built Drawings shows how the redlines shall be prepared following the approval and implementation of each construction activity. This describes the process, roles and responsibilities, requirements, records to be maintained, and approval of redline drawings. The “red-line”Continue Reading