The Quality Management Plan (QMP) in Project Management
Project managers are well aware of the three constraints such as time, scope, and cost. But in all honesty, quality ought to be the fourth restriction. A Quality Management Plan (QMP) is crucial since the quality of your work may make or destroy a project. The project will not beContinue Reading
Method Statement for Solar Panel Installation
Purpose The purpose of this method statement for solar panel is to describe the sequential approach for the installation of PV Modules in accordance with the contract requirements. This method statement shall ensure that the installation is executed safely. This aims to ensure that quality assurance and quality control activitiesContinue Reading
Method Statement for Lifting Activity
Objective The Method Statement for Lifting Activity ensures that lifting, moving, and shifting materials at the project site are covered by a Safe System of Work. This is the best way to demonstrate that the risk associated has been carefully considered and appropriate controls have been implemented. The health andContinue Reading
Best HVAC Software for Small Business
It’s difficult to run HVAC field service businesses, and you need strong software to do it. Pick one of these five HVAC software options to run your company more profitably.The HVAC sector is flourishing. According to the Bureau of Labor Statistics, it presently employs close to 400,000 people in theContinue Reading
Method Statement for Fireproofing Works
Purpose This method statement for fireproofing works describes the construction and control actions to be done to meet the requirements for lightweight concrete fireproofing works on structures and equipment skirt/support. Scope The general specifications for materials and workmanship for all structural and equipment skirt/support lightweight fireproofing works are covered inContinue Reading
Method Statement for Roof Works
What is the Method Statement for Roof Works? A method statement for roof works gives a company the ability to describe the codes of conduct and standard procedures followed when performing roofing activities. It also lists several known risks and the controls implemented to manage roofing safety on their worksitesContinue Reading
Method Statement for Marble Wall Cladding
This Method Statement for marble wall cladding describes the steps involved in the installation in accordance with approved shop drawings, quality, and safety requirements. Scope of Works This method covers the application of marble and granite works as wall cladding for both exterior and interior areas. All works shall beContinue Reading
Method Statement for Field Smoke Testing of Curtain Wall
The Method Statement for Field Smoke Testing of Curtain Wall describes the testing procedures, post-test analysis, report, testing equipment used, and other pertinent information covered in the methodology. Once the system is finished and closed off, the aim is to ensure that there is no air leakage (and no humidity) enteringContinue Reading
Method Statement for Static Load Pile Testing
This method statement for static load pile testing covers the procedure for testing vertical piles to determine their response to static compressive loading. What is a static pile load test? A static pile load test is performed to measure how a pile behaves under an applied load. 1. General This pile loadContinue Reading
What is lean concrete and where it is used?
What is lean concrete in civil engineering? Lean concrete is a mix in which the cement content is less than the amount of liquid present in the strata. Lean concrete mix is the phrase used in the construction industry when less than 10% of the mix’s cement content actually exists.Continue Reading